Basement Remodeling in Maryland & Washington, DC
What a basement remodel with us includes
Finishing an unfinished basement. Framing, insulation, electrical, lighting, flooring, drywall, and finishes, turning bare space into a living area, guest suite, home office, gym, or media room.
Updating a finished basement. A new layout, finishes, or features for a basement that’s dated or no longer fits how you live.
Common additions include a full or half bathroom, a wet bar or kitchenette, an egress window for a legal bedroom, built-ins, and storage.
Basements bring their own questions: moisture, ceiling height, egress, and what’s already behind the walls. We look at all of it during the visit and address it in design, so it’s part of the plan and the price, not a surprise halfway through.
We handle the permits and coordinate the trades. You don’t have to manage a single subcontractor.
What does a basement remodel cost?
Finishing an unfinished basement: typically $[X] to $[X]
Finished basement with a bathroom or wet bar: typically $[X] to $[X]+
Updating an existing finished basement: typically $[X] to $[X]
Most basement remodels take 6-12 weeks to complete.
What moves the number:
Size and layout. Square footage, and how many rooms you divide it into.
Moisture and waterproofing. Any existing water issues need to be solved before anything is finished.
Plumbing. A bathroom or bar can add significantly if plumbing has to be added or moved.
Ceiling height, egress, and code. These can change both what’s possible and what it costs.
Finish level. Flooring, lighting, and built-ins add up quickly.
The best way to know your number is a free visit. You’ll get a written investment range, so you know whether your project is realistic before you spend anything.
Not ready for a visit? Try our free basement cost calculator and see a range in about 60 seconds.
How It Works
Schedule a visit. We come to your home, walk the space, take basic measurements, and talk through your vision and goals. You’ll receive a written investment range and a short video walking you through it.
1. Free consultation
We plan every detail with you: layout, materials, and finishes, with the full scope in writing. You then receive one fixed price that doesn’t change.
2. Design
A dedicated project manager keeps your project on plan and on schedule, with a weekly report on what was done and what’s next. We walk the finished space with you at the end.
3. Build
Common Questions Before Remodeling a Basement
-
Most basement projects fall between $[X] and $[X], depending on size, whether you add a bathroom or bar, and the moisture conditions. A free visit is the fastest way to get a real range for yours.
-
A typical basement remodel takes 6 to 12 weeks to complete. Design happens before construction, so once work begins the schedule is already planned.
-
In most cases, yes. We handle the permits and tell you what applies to your project during design.
-
We look for it during the visit and address it in design, so the fix is built into the plan and the price. Finishing over an unresolved moisture problem is how basements fail, so we don’t skip that step.
-
Often yes. It depends on egress, ceiling height, and plumbing access, and we’ll tell you what’s possible when we see the space.
-
Usually yes, since basement work is separate from your main living space. We install dust barriers and air scrubbers to protect the rest of the house, along with any necessary flooring and jobsite protection, so the mess and dust stay where the work is happening.
-
It’s a relaxed, no-pressure visit, usually about 30-60 Minutes. We walk the space, take basic measurements, and talk through your vision, goals, and timeline. There’s no sales pitch and no obligation. Afterward, you’ll receive a written investment range and a short video walking you through it. If it feels right, the next step is design.
Ready to see what your basement could become?
Schedule a free home visit and find out whether your project makes sense, at no cost.